Well...maybe look down for now. I measured the ceiling and figured out the amount of material required. The pile represents all the trim needed for the room as well as the material for the ceiling. I went with the direct mount 'CeilingMAX' system because my basement has a very low ceiling.
No comments:
Post a Comment